Stage 2- Tender Construction

back to build summary ….

K3 2007-13.jpg
The two tender frames erected
K3 2007-14.jpg
The 4200 gallon tender frame close up
K3 2007-15.jpg
And a view from above
K3 2007-16.jpg
The 3500 gallon tender frame. Note the simple design compared with the later type
K3 2007-17.jpg
And a view highlighting the riveted dragbox, a difficult assembly
K3 2007-18.jpg
The loco and tender frames exhibited at Harrogate in 2007
K3 2007-19.jpg
The LNER tender with axleboxes
K3 2008-21.jpg
Two dozen spring hangers part machined
K3 2008-22.jpg
Part machined hangers on the drawing
K3 2008-23.jpg
Spring hangers almost complete
K3 2008-24.jpg
Machining the backs of the hangers
K3 2008-25.jpg
All nearly finished
K3 2008-26.jpg
A Spencer spring block top being machined
K3 2008-27.jpg
Spring blocks in various stages of manufacture
K3 2008-28.jpg
Sets of six blocks in various stages of final hand finishing
K3 2008-29.jpg
Spring plates halfway through bending
K3 2008-30.jpg
The plate roller made for the job
K3 2008-31.jpg
Plates bent, drilled and ends chamfered ready for assembly
K3 2008-32.jpg
A top plate in the jig for soldering the retaining bars in place
K3 2008-33.jpg
The GNR frames with springs in place
K3 2008-34.jpg
The LNER frames ditto and ready for the tank. April 2008
K3 2007-20.jpg
Photo_08-01.jpg
October 2008 Once the tender frames were erected the next step was the tanks. Here is the sole plate for the GN 3500 gallon tender marked out for drilling and cutting out the holes
Photo_08-02.jpg
Now clamped to the milling machine the holes for the blind bushes for the holding down studs have been drilled and a start is being made on the larger cut outs.
Photo_08-03.jpg
All the machining operations done and the angle fitted for the side and end plates and the blind bushes in place.
Photo_08-04.jpg
The side plates have been bent and are standing on the sole plate. The gap at the back is to be filled with a narrow strip with lap straps riveted in place. This is easier than attempting to make the two sides meet in the middle. They can be machined exactly the same and the gap can be accurately measured for the filler plate.
Photo_08-05.jpg
This is one of the internal splashers required because the large diameter wheels foul the sole plate
Photo_08-06.jpg
The sides now in place and fixed with countersunk screws. These are preferable to rivets as riveting, apart from being awkward, causes distortion of the plates.
Photo_08-07.jpg
A side view of the tender showing the screws. The vertical plate inside is a stiffener to strengthen the body as the driver will ride on a seat on the tender.
Photo_08-08.jpg
The tender back showing the filler piece in place
Photo_08-09.jpg
A view with the front plate and top angles now fitted
photo_08-10.jpg
This is the well tank on the milling machine for cutting the opening for the strum box where the filters live and water is drawn off by the locomotive’s injectors. The well is of riveted construction with flanged end plates. Made in two halves it has an external lap strap which is visible when the tender is completed.
Photo_08-11.jpg
These are the vertical stanchions that carry the coal rails round the top of the tender and were bent up and drilled for the rivets on a former.
Photo_08-12.jpg
The top flares have been fitted ready for the coal rails and the coal space plates have been bent up and fitted. The cavities at each side form cupboards
photo_08-13.jpg
Now advancing well the coal rails are in place and all the beading has been fitted and riveted and soldered. The front plate is complete with the cupboard doors and is being checked for fit before being screwed to the angles
photo_08-14.jpg
A view of the tender from the rear without the coal space plating
photo_08-15.jpg
The 4500 gallon tender had gone through a similar process prior the the GN tender, but for some reason I had neglected to take photographs. Here is a front view. The platework is held together with screws at this stage. Although this version of the Group standard tender was welded, the beading was still riveted on and these can clearly be seen.
Photo_08-16.jpg
Rear of the 4500 gallon tender
Photo_08-17.jpg
Side view of the 4500 gallon tender
Photo_08-18.jpg
Boring the holes in the tank top
Photo_08-19.jpg
Top view of the two tenders before final soldering
Photo_08-20.jpg
Front view of both tenders
Photo_08-21.jpg
Rear view of both tenders
Photo_08-22.jpg
Both tenders will be fitted with water pick up apparatus given time. The fixing points are incorporated in the bottom of the tanks and this is the top of the riser pipe. Whilst it is unlikely ever to be used for taking water it serves as an overflow for when the tank is being filled and saves water being sprayed all over when the tank is full
Photo_08-23.jpg
Now that all the main components have been made and fitted together, they were dismantled and cleaned ready for final assembly and soldering. This is the 4500 gallon sole plate.
Photo_08-24.jpg
One side plate erected
Photo_08-25.jpg
And the inside view
Photo_08-26.jpg
Front back and side plates erected ready for soldering showing the internal stiffeners.
Photo_09-01.jpg
The tenders were substantially complete by March 2009 requiring only the fixtures and fittings – brake gear, water valves and the like, so work returned to the locomotives. The horn stays were fabricated next so that the horn gaps could be secured for final machining. Here is a set of frames on the milling machine for this operation.
Photo_09-02.jpg
A close up of the machined horn faces
Photo_09-03.jpg
And now with the horn stays in position
Photo_09-04.jpg
Now the frames were ready for the axleboxes a length of cast gunmetal was milled to size.
photo_09-05.jpg
Here is the short length ready for cutting into individual blocks
Photo_09-06.jpg
Twelve squared blocks ready for machining
Photo_09-07.jpg
Chain drilling the axlebox to create the split bearing
Photo_09-08.jpg
After saw cutting each side the material is broken out using a taper punch
Photo_09-09.jpg
An embryo axlebox
Photo_09-10.jpg
Axleboxes in various stages
Photo_09-11.jpg
After machining the slots the under trays are machined to fit and the box is centered in the four jaw chuck and bored to size
Photo_09-12.jpg
Boring in progress
Photo_09-13.jpg
Milling the axlebox sides
Photo_09-14.jpg
Twelve axleboxes machined all over
Photo_09-15.jpg
An oil tray ready for milling out
Photo_09-16.jpg
And the finished article ready to have the filler and fixing lug fitted
Photo_09-17.jpg
An axlebox front with the oilseal carrier fitted. A plaited wool seal will go into the brass ring to prevent dirt getting in to the bearing
Photo_09-18.jpg
Machining the oil grooves on the horn faces of the axleboxes
Photo_09-19.jpg
Completed oil grooves. The two small pins securing the underkeep and the larger pin for suspending the leaf spring can bee seen
Photo_09-20.jpg
An axlebox ready for final fitting.Next the axles. This was February 2010 a year from stopping work on the tenders

Note 1 –  

After the first year’s work on loco frames, I decided to start on the tenders. There’s nothing worse than getting a loco complete and ready to run, and then having to start on the tender – bitter experience!