Stage 8 – Cylinders inside

back to build summary ….

Photo__1.jpg
The process begins in the obvious way with the preparation and machining of the end plates
Photo__2.jpg
Two cylinder back plates mounted on the mill for sizing and squaring
Photo__3.jpg
The steam passages were machined next from a block of gunmetal. Mounted on the rotary table the outside shape was simple to machine after drilling pilot holes for the centre of the steam chest and the outer radius and the holes for the mounting pins.
Photo__4.jpg
The top edge was finished using a corner rounding cutter
Photo__5.jpg
The piece was cut off using a hacksaw rather than setting up for a slitting saw.
Photo__6.jpg
The pieces were set up in the four jaw and after centering on the steam passage pilot , faced off and bored part depth to form the steam passage.
Photo__7.jpg
Once all were done, they were each put back in the mill to open out the steam passage for the connection to the cylinder
Photo__8.jpg
Also - Once all were done, they were each put back in the mill to open out the steam passage for the connection to the cylinder
Photo__9.jpg
The parts were then attached to the front and back plates by lightly riveting them using brazing rod
Photo_10.jpg
Followed by silver soldering
Photo_11.jpg
The front and back plates were then set up in the lathe for boring out the holes for the cylinders
Photo_12.jpg
Also - The front and back plates set up in the lathe for boring out the holes for the cylinders
Photo_13.jpg
As the valve chests are not parallel with the cylinders a different technique was required for boring the holes in the endplates.
Photo_14.jpg
The plates were set up on an angle plate on the rotary table on the mill. Slightly precarious, hence the blocks on the edge to stabilize the workpiece, and carefully bored to the require size.
Photo_15.jpg
Here they are temporarily mounted in the frames to show where they go.
Photo_16.jpg
Two side plates are needed to fix the inside cylinder to the outside cylinders. There are no bolts connecting the inside cylinder to the frame plates. the three cylinders can be bolted together to form a complete cylinder block, the traction forces being transmitted to the frames through the cylinder bolts and via the cut outs in the frame plates that closely fit the inside cylinder side plates. The side plate bolt holes are being drilled
Photo_17.jpg
The drawing for the side plates.
Photo_18.jpg
Milling the outside profile if the side plates using MNC (manual numerical control)
Photo_19.jpg
Slotting a side plate for locating the back and front plates and the longitudinal support
Photo_20.jpg
Slotting for the two internal support plates
Photo_21.jpg
Two side plates slotted ready for trial assembly
Photo_22.jpg
Unlike to outside cylinders there are no ribs on the inside cylinder barrel, seen here being bored.
Photo_23_.jpg
The bore is opened up at each end and the internal chamfer made as the outside cylinders and set up with the end plugs so the outside can be turned between centres, concentric with the bore.
Photo_24.jpg
The outside is finished by rebating the ends, and reducing the middle to give the required wall thickness and then put on the rotary table to machine the locating slot for the longitudinal support.
Photo_25.jpg
With the same set up the steam passages are milled into the cylinder wall
Photo_26.jpg
An inside cylinder begins to take shape
Photo_27.jpg
The internal support plates are machined as the end plates but the valve opening is square to the plate and can be bored in the lathe. The valve bore is big enough to cut out at the side and a sacrificial piece of brass plate is provided so the tool does not collide with the adjacent chuck jaw.
Photo_28.jpg
The cylinder opening needs to be bored as before on the milling machine at the correct angle and here the holes are being drilled for the assembly rods before the main bore is started
Photo_29.jpg
The cylinder opening is bored to size
Photo_30.jpg
A trial assembly of the supporting components to check that it all goes together as intended
Photo_31.jpg
Also - a trial assembly of the supporting components to check that it all goes together as intended
Photo_32.jpg
Also - a trial assembly of the supporting components to check that it all goes together as intended
Photo_33.jpg
The internal support plates have to be split across the centre to allow assembly because the cylinder ends are a larger diameter than the barrel. A horizontal slot is machined at the half height of the cylinder corresponding with the longitudinal support plate leaving just a narrow connection between the two bores
Photo_34.jpg
On assembly a thin blade is used to cut the internal support plates so they can be fitted either side of the cylinder, valve chest and longitudinal support plate. The trial assembly shows the cylinder and it's back cover (made with the outside cylinder covers) in position.
Photo_35.jpg
The valve housing or steam chest is made exactly as those for the outside cylinders that was seen on Page 6, except at one end the flange for the crosshead guides is omitted and fitted after the part is inserted into the assembly. Also a flat is machined along the length where the side mounting plate abuts the steam chest
Photo_36.jpg
The valve housing is shown in place in the assembly
Photo_37.jpg
The inside cylinder assembly temporarily positioned in the frames showing how close the valve is to the inside face of the frame.
Photo_38.jpg
Before proceeding to the first soldering operation the exhaust passages from the outside cylinders are machined in the side plates
Photo_39.jpg
A side plate temporarily fixed with steel screws having run out of brass ones - again, showing the exhaust passage holes filed out so they point in something like the right direction
Photo_40.jpg
The top half of the internal support plates also support the underside of the exhaust passages which all meet under the blast pipe
Photo_41.jpg
They are shown here in what was expected to be there final position
Photo_42.jpg
The inside cylinders are nearly ready for the first silver soldering with the end plates roughly cut to shape for the smokebox saddle plate and the openings made for the exhaust passages from the front and back of the valve housing. Correcting fluid has been applied to those places where silver solder is not wanted.
Photo_43.jpg
The two cylinders are fluxed ready for the first silver soldering.
Photo_44.jpg
A cylinder in position in the frames after being silver soldered and pickled.
Photo_45.jpg
Machining the sides of the cylinder block to ensure the bore is exactly in the centre. The cylinder is mounted on the mandrel made from the pressure testing gear shown earlier and mounted between centres on the rotary table. The sides can then be progressively machined to close to the required spacing and the final cut to each side made with the sane tool setting. The same set up is also used for spotting the cylinder drain positions and spot facing for the flange plates to be located.
Photo_46.jpg
The exhaust passage walls are seen passing through the side plates with the 10BA fixings angling through. The Dremel is a very useful tool for drilling the holes for these, but temporary clamping is challenging.
Photo_47.jpg
The side walls for the exhaust passages were made up from brass sheet, cut to follow the cylinder and valve chest reasonably closely after being bent to shape in the horizontal plane. 10 BA brass screws were used to fix these in position for the next silver soldering operation.
Photo_48.jpg
The exhaust passage walls are seen passing through the side plates with the 10BA fixings angling through. The Dremel is a very useful tool for drilling the holes for these, but temporary clamping is challenging.
Photo_50.jpg
The slide bar support has been fixed to the back if the cylinder, hopefully in the correct position, as there is little room for error at this point.
Photo_51.jpg
Finally the flanges for the cylinder drains are put on, and all is ready for the next phase of silver soldering.
Photo_52.jpg
The cylinders carefully treated with correcting fluid and fluxed ready to be silver soldered
Photo_53.jpg
After silver soldering and pickling
Photo_54.jpg
Templates being made for the floors of the exhaust passages
Photo_55.jpg
All floor sections in place for silver soldering
Photo_56.jpg
After silver soldering
Photo_57.jpg
Machining surplus material from the exhaust port walls and profiling the centre fin of the blast pipe base
Photo_58.jpg
The oval blast pipe flanges were machined from a block of bronze mounted on the rotary table in the milling machine
Photo_59.jpg
Also - the oval blast pipe flanges were machined from a block of bronze mounted on the rotary table in the milling machine
Photo_60.jpg
Also - the oval blast pipe flanges were machined from a block of bronze mounted on the rotary table in the milling machine
Photo_61.jpg
Also - the oval blast pipe flanges were machined from a block of bronze mounted on the rotary table in the milling machine
Photo_62.jpg
Also - the oval blast pipe flanges were machined from a block of bronze mounted on the rotary table in the milling machine
Photo_63.jpg
Also - the oval blast pipe flanges were machined from a block of bronze mounted on the rotary table in the milling machine
Photo_64.jpg
Opening up the centre with the boring bar
Photo_65.jpg
Using the slitting saw to part off the two blast pipe bases and two flanges
Photo_66.jpg
A blastpipe base in position
Photo_67.jpg
Blast pipe base drilled for studs and the first exhaust passage tops in position. I'll leave it here for the next instalment , which will start with the making of the smokebox saddle plate, an integral part of the inside cylinder structure

Note 1 –

As work progressed on the inside cylinders I realised the risks of each operation were becoming greater and that any error could cost my considerable investment in time and materials if it was not recoverable, so each step was made only after a lot of thought, making sure that no part had been overlooked before it was impossible to go back and correct the omission.

Each machining operation was also carefully planned in my head before committing to cutting metal. Hopefully I’ve got it right and I’m not ending this project with a glass case model.

I spent many hours pondering how to draw the inside cylinder, let alone build it. Having a copy of the full-size cylinder drawing helped with the detail, but actually getting my head around putting together a cylinder that was inclined in relation to its valve chest was really challenging. I followed the concept used for the outside cylinders, but the construction needed to be different, not least because the internal support plates were inclined in relation to the ends

The process begins in the obvious way with the preparation and machining of the end plates